CornerstoneAttestation Registry
Public verification · no CUI
CORNERSTONE · ATTESTATION · VERIFIED · EVIDENCE ·

Proof a building is what the record says.

Every entry here is a cryptographically signed statement about a building's control-system baseline over a period — carrying only hashes and counts, never device, network, or facility data. Anyone can verify one independently.

Published attestations
0
Registry chain
intact & verifiable
Chain head

Verify an attestation

Paste an attestation envelope you were sent. Verification is instant and needs nothing but the envelope — it checks the signature and recomputes the evidence root from the signed facts.

Published attestations

No attestations have been published yet. When a building is turned over or a monitoring period closes, its signed attestation is published here and becomes independently verifiable by anyone — no login, no access to the building's data.

How verification works

A verifier holds only the envelope. That is enough to prove it is authentic and internally consistent — and it is impossible to reconstruct any facility data from it.

01

Paste the envelope

A signed statement of a baseline hash, the ledger range it covers, and a summary of change over the period. Only hashes and counts.

02

Check the signature

The Ed25519 signature is verified and the evidence root is recomputed from the signed facts. A tampered payload or a wrong signer fails immediately.

03

See what's proven

Who signed it, the period, the committed baseline, and the evidence root — plus, plainly, what the envelope alone cannot prove without the ledger.